Saturday, November 21, 2009

The Continuing Breakdown of the Temps

I managed to get back again on Thursday and take more pics as they worked on the old music/PE rooms and the art room. It rained all day Friday so no deconstruction was done. Too wet.

But first, a before look. This picture was taken in May. The music and PE rooms are on the right, the art room on the left, complete with stairs and sidewalk coverings.

After: the ramp leading up the stairs is now gone, along with the sidewalk coverings.

And now they're getting ready to bulldoze the stairs.


Now it's all gone. :(


Don't you just love how these temps are precariously balanced on cinder blocks?

Taking down the sidewalk coverings by the art room.

The stairs are next to go.

The debris is piling up in what used to be our parking lot.




No comments:

Post a Comment